US ROUTE 7 CORRIDOR STUDY

The US 7 Winooski to Georgia Corridor Study was initiated in 1999 by the CCMPO and the Northwest Regional Planning Commission. The study was completed in September 2001. Its purpose was to develop strategies to address long-term transportation needs along and near the corridor, assess the impact of land use patterns, and develop strategies with the four municipalities of Winooski, Colchester, Milton and Georgia to plan effectively for future growth along US Route 7.

The study was conducted by a consultant team headed by Oman Analytics under the direction of a study advisory committee (SAC). The SAC consists of two representatives appointed by each municipality, professional staff from each municipality and representatives from the Vermont Agency of Transportation, CCTA, Chittenden County Regional Planning Commission, Northwest Regional Planning Commission, CCMPO, the Vermont Transportation Alliance and the business community.
A final document was prepared and dated September 28, 2001. This website contains links to Adobe Acrobat files containing the Final Report, which synthesized all the work done in six prior technical memos into a comprehensive transportation plan for the corridor that included major new transportation facilities and services, land use and development strategies, site specific design alternatives and an implementation and funding schedule. Please note some of the files are very large and will require long download times if you have a telephone internet connection. Paper copies of the study are available from CCMPO upon request.

VOLUME 1: US ROUTE 7 CORRIDOR STUDY

Chapters 1 – 3
Introduction, Findings, Land Use Strategies (1.6 MB)

Chapter 4
Network Plan (6.9 MB - LARGE FILE)
Chapter 5
Modal Plan (1.6 MB)
Chapter 6a
Supporting Improvements - Winooski, Colchester (1.5 MB)

Chapter 6b
Supporting Improvements - Milton (1.6 MB)

Chapter 6c
Supporting Improvements - Georgia, Railroad Crossings (2.9 MB - LARGE FILE)

Chapter 6d
Supporting Improvements - Growth Centers

(2.8 MB - LARGE FILE)

Chapter 7
Implementation (92 kB)
VOLUME 2: SUPPORTING DOCUMENTS

Chapter 1
Overview of Current Plans (187 kB)

Chapter 2
Existing Conditions (4.9 MB - LARGE FILE)

Chapters 3 – 5

Public Input, Build-out, Transportation Alternatives (1.5 MB)

 
VOLUME 3: APPENDICES

Appendices 1 – 4
(385 kB)

Appendix 5
Build-out (190 kB)